Article
Publication date: 11 October 2022

Kieran Taylor, David J. Edwards, Joseph H.K. Lai, Iain Rillie, Wellington Didibhuku Thwala and Mark Shelbourn

This study aims to develop a decision-making tool that assesses the economic feasibility of converting commercial and industrial buildings into rented residential accommodation…

Abstract

Purpose

This study aims to develop a decision-making tool that assesses the economic feasibility of converting commercial and industrial buildings into rented residential accommodation. This tool also enables developers to provide high-quality rented residential accommodation that contribute to the gentrification of formerly industrialised inner city or developed areas.

Design/methodology/approach

The overarching epistemological approach adopted used inductive reasoning and a postpositivist philosophical design to structure the research problem and devise new theories about the phenomena under investigation. From an operational perspective, a two-phase “waterfall” research approach was adopted. Phase one used extant literature to identify development factors and variables for consideration, risks posed and conversion appraisal criteria. Two case studies formed the basis of a cross comparative analysis, namely, a new build and conversion of a former industrial building into rented residential accommodation. Phase two identified development appraisal criteria, conducted a cost analysis and premised upon the findings, developed a decision support appraisal tool as a “proof of concept”.

Findings

The research combined key decision factors and variables that assist property developers when evaluating whether to convert commercial and industrial property into rented residential accommodation. The appraisal tool’s functionality was validated via a focus group discussion with senior property developers to ensure that assessment criteria and development weightings were appropriate. Feedback revealed that the tool was suitable for purpose and should now be adopted in practice and refined as appropriate and with usage.

Research limitations/implications

The appraisal tool presented could yield a far more accurate means of decision-making which, in turn, could ensure that predicted investment returns are received (thus reducing errors and lowering risk for investors). Future work is required to robustly test and validate the tool’s accuracy in practice. It is envisaged that future projects will provide a rich stream of data for such testing.

Originality/value

To the best of the authors’ knowledge, this work constitutes the first attempt to conceptualise a decision support tool for rented residential property development.

Article
Publication date: 24 April 2020

David John Edwards, Iain Rillie, Nicholas Chileshe, Joesph Lai, M. Reza Hosseini and Wellington Didibhuku Thwala

Excessive exposure to HAV can lead to hand–arm vibration syndrome (HAVS) which is a major health and well-being issue that can irreparably damage the neurological, vascular and…

Abstract

Purpose

Excessive exposure to HAV can lead to hand–arm vibration syndrome (HAVS) which is a major health and well-being issue that can irreparably damage the neurological, vascular and muscular skeletal system. This paper reports upon field research analysis of the hand–arm vibration (HAV) exposure levels of utility workers in the UK construction sector when operating hand-held vibrating power tools.

Design/methodology/approach

An empirical epistemological lens was adopted to analyse primary quantitative data on the management of hand-held tool trigger times (seconds) collected from field studies. To augment the analysis further, an interpretivist perspective was undertaken to qualitatively analyse interviews held with the participating company's senior management team after field study results. This approach sought to provide further depth and perspective on the emergent numerical findings.

Findings

The findings reveal that none of the operatives were exposed above the exposure limit value (ELV) and that 91.07% resided under the exposure action value (EAV). However, the Burr four parameter probability model (which satisfied the Anderson–Darling, Kolmogorov–Smirnov and chi-squared goodness of fit tests at α 0.01, 0.02, 0.05, 0.1 and 0.2 levels of significance) illustrated that given the current data distribution pattern, there was a 3% likelihood that the ELV will be exceeded. Model parameters could be used to: forecast the future probability of HAV exposure levels on other utility contracts and provide benchmark indicators to alert senior management to pending breaches of the ELV.

Originality/value

HAV field trials are rarely conducted within the UK utilities sector, and the research presented is the first to develop probability models to predict the likelihood of operatives exceeding the ELV based upon field data. Findings presented could go some way to preserving the health and well-being of workers by ensuing that adequate control measures implemented (e.g. procuring low vibrating tools) mitigate the risk posed.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 June 2020

Chris Newman, David Edwards, Igor Martek, Joseph Lai, Wellington Didibhuku Thwala and Iain Rillie

Industry 4.0 is predicted to be a game-changer, revolutionizing commercial and manufacturing practices through improved knowledge utilization and efficiencies. The barriers…

3769

Abstract

Purpose

Industry 4.0 is predicted to be a game-changer, revolutionizing commercial and manufacturing practices through improved knowledge utilization and efficiencies. The barriers however, are significant, and the construction industry remains notoriously slow to take up innovations. This study reviews the research work in Industry 4.0 as it relates to construction, and examines a leading UK-based construction firm to ascertain the prognosis for Industry 4.0 roll-out in terms of the impediments and opportunities.

Design/methodology/approach

A multistage mixed philosophies and methods approach was adopted for this study. First, an interpretivist epistemological lens was used to synthesise extant literature as a means of contextualizing the present study. Second, an empirical case study using a post-positivist stance and inductive reasoning was conducted to explore practitioner acceptance of Industry 4.0 in the UK construction context.

Findings

Findings from the literature review indicate studies in Industry 4.0 to be a relatively new phenomenon, with developed countries and Germany in particular leading in the field. The range of opportunities are many, but so too are the barriers to enablement. Findings from the case study provide real-world corroboration of the review; practitioners are sanguine about Industry 4.0's potential to reinvigorate the construction industry, but also note that implementation remains curtailed by residual managerial practices dependent on ‘human interaction’. At present, much of the focus of industry practitioners is on the implementation of building information modelling (BIM), often at the expense of other more advanced technologies within Industry 4.0.

Originality/value

Research in Industry 4.0 is limited, with the emphasis being on technology application. This paper, by contrast, maps the totality of work carried out so far and presents an assessment of Industry 4.0's progression, potential and degree of uptake within the UK construction industry.

Details

Smart and Sustainable Built Environment, vol. 10 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 June 2021

David John Edwards, Jahangir Akhtar, Iain Rillie, Nicholas Chileshe, Joseph H.K. Lai, Chris J. Roberts and Obuks Ejohwomu

The advent of Industry 4.0 has engendered opportunities for a coalescence of digital technologies that collectively enable driverless vehicles to operate during the construction…

Abstract

Purpose

The advent of Industry 4.0 has engendered opportunities for a coalescence of digital technologies that collectively enable driverless vehicles to operate during the construction and use of a highway. Yet, hitherto scant research has been conducted to review these collective developments and/or sample construction practitioner opinion on them. This study aims to present a systematic review of extant literature on the application of driverless technologies in civil engineering and in particular, the highways infrastructure sector and offers insight into the limitations of associated barriers to full adoption, namely, current technological development processes, legal deficiencies and societal concerns. In so doing, this work presents a vignette of contemporary developments augmented by a critical analysis from practitioners’ perceptions.

Design/methodology/approach

A mixed philosophical methodological approach is adopted for this inductive research study. Interpretivism is used to critically analyse the literature and post-positivism to perform content analysis of the literature and synthesis of the discourse with practitioners. A total of 44 related papers published between 1998 and 2019 have been included in this study. Emergent themes identified from literature are then discussed in some further detail, namely, 1) automation and robotics; 2) case studies and simulations; and 3) safety and ergonomics). A focus group is then held with leading industrialists to discuss their experiences of advanced driverless technology applications in practice. Based upon a culmination of emergent evidence, a conceptual model of prevailing barriers is then developed to further elucidate upon the challenges facing the highways infrastructure sector.

Findings

Research into driverless technologies within the highways infrastructure sector has received relatively scant academic attention. Hitherto, most advancements made have stemmed from multidisciplinary teams consisting of engineering, information technology and social scientist researchers. There is insufficient supporting evidence of civil engineering and construction academics input into developments made – suggesting that prototype products often fail to adequately consider practical applications in the highways infrastructure sector at the design and use case stage. This view is substantiated by feedback from leading industry experts who participated in unstructured telephone interviews. Their feedback suggests that practical applications of products have been beset with problems, thus creating a perception that advanced technologies are largely “unusable” within the highways infrastructure sector and so are unsuitable for large-scale (and particularly bespoke) industrial applications.

Originality/value

This research critically synthesises the prevailing scientific discourse within extant literature on driverless technologies implemented but also garners practitioner feedback from leading UK industrialists on their applications in practice. Hitherto, this combined analysis approach has been rarely used in spite of it having significant advantages of tacit knowledge reflection on technologies used, where such can be used as a basis for further informed discourse and/or development. Moreover, this work culminates in a conceptual model that acts as a catalyst for future research investigations.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 February 2019

David Edwards, Erika A. Parn, Michael C.P. Sing and Wellington Didibhuku Thwala

Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant…

Abstract

Purpose

Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant number of excavators overturn whilst conducting a lifting operation, causing damage to property, personnel injury or even fatality. The reasons for the overturn are myriad, including: operational or environmental conditions; machine operator acts or omissions; and/or inadequate site supervision. Furthermore, the safe working load (SWL) figure obtained from manufacturer guidance and utilised in lift plans is based upon undertaking a static load only. The purpose of this paper is to determine whether the SWL is still safe to be used in a lift plan when slewing a freely suspended (dynamic) load, and, if not, whether this may be a further contributory factor to overturn incidents.

Design/methodology/approach

Previous research has developed a number of machine stability test regimes but these were largely subjective, impractical to replicate and failed to accurately measure the “dynamic” horizontal centrifugal force resulting from slewing the load. This research contributes towards resolving the stability problem by critically evaluating existing governing standards and legislation, investigating case studies of excavator overturn and simulating the dynamic effects of an excavator when slewing a freely suspended load at high rotations per minute (rpm). To achieve this, both the static load and horizontal centrifugal force from slewing this load were calculated for six randomly selected cases of an excavator, with different arm geometry configurations.

Findings

The results from the six cases are presented and a worked example of one is detailed to demonstrate how the results were derived. The findings reveal that the SWL quoted on an excavator’s lift rating chart considerably underestimates the extra forces experienced by the machine when an additional dynamic load is added to the static load whilst lifting and slewing a freely suspended load.

Originality/value

This work presents the first attempt to accurately model excavator stability by taking consideration of the dynamic forces caused by slewing a freely suspended load and will lead to changes in the way that industry develops and manages lift plans. Future research proposes to vary the weight of load, arm geometry and rpm to predict machine stability characteristics under various operational conditions, and exploit these modelling data to populate pre-programmed sensor-based technology to monitor stability in real time and automatically restrict lift mode operations.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords